-
ISO · Edition 2, February 2018; confirmed in 2023
What is ISO 31000?; Why is ISO 31000 important?; certification FAQ
This source is ISO's public overview of the standard, which introduces its principles and risk-management process.
-
PMI · September 2024 practice guide
Overview; Product Specifications; legacy risk-standard page's update notice
The source is PMI's public overview and update notice; the complete practice guide contains the detailed procedures and roles.
-
AACE · PGD02 revision March 18, 2024
Purpose; QRA Principles and Method Types: RP 40R-08; Fit-For-Use
This publication is a roadmap to quantitative risk analysis. The underlying recommended practices are separate documents with their own revisions.
-
Orion Matthews and Tonya White · Project Control Summit presentation, 2023
Orion Matthews and Tonya White. Unlocking Project Success: Building Timely and Accurate Reporting for a Major Capital Project. Project Control Summit, 2023. Public recording linked from the presenter’s events page.
Slides 7-19 and 21-27; harvest-process animation on slide 17.
The presentation illustrates the reporting setup and harvest cycle. Its dashboard figures are randomized examples.
-
AACE International, Source magazine · April 2019 technical article
James E. Arrow, Arvid Markhus, Vijai Singh, Cesar Ramos and Stefan Bakker. Source, AACE International, April 2019, pp. 15-23.
Printed pp. 17-22, especially the data-science activities on p. 19; PDF pp. 19-24.
This is a technical article published in 2019, separate from AACE's standards and Recommended Practices. Its technology forecasts belong to that period.
-
NIST · AI RMF 1.0, 2023; revision noted on the publisher page
Framework overview and version notice
The cited source is NIST's public overview of the AI Risk Management Framework.
-
NIST · NIST AI 600-1, July 2024
Publication record and abstract
The cited source is the publication abstract for NIST's generative AI companion profile.
-
Storytelling With Multiple Data Systems
Orion Matthews · Schedule Validator User Conference, 2025
Orion Matthews. Storytelling With Multiple Data Systems. Schedule Validator User Conference, 2025. Supplied presentation.
PDF pages 7-13, 17 and 19; reporting calendar and harvest process on page 10.
-
Orion Matthews · Supplied deck labelled 2026; exact presentation date not established
Orion Matthews. Exploring an API Reporting Pipeline for Project Controls, subtitle in the supplied 2026 deck. Supplied presentation.
PDF pages 10-14, 19, 25-30 and 33-36.
-
U.S. Government Accountability Office · GAO-16-89G, December 2015
Best Practice 9, Statusing Progress, printed page 122 (PDF page 136).
-
ISO · Edition 2, April 2016; confirmed in 2021
Public abstract and publication status.
The source is ISO's public abstract for the records-management standard. It outlines concepts and principles without specifying a database lock or retention period.
-
United States Courts · Rules amended to December 1, 2025
Rule 37(e), printed pages 64-65 of the current official rules PDF (PDF pages 83-84).
Rule 37(e) concerns loss of electronically stored information in U.S. federal civil litigation.
-
Microsoft Learn · Public technical guidance, updated April 6, 2025
Orchestration, staging, transformation, logging, historical changes and downstream dependencies.
This is Microsoft Fabric product documentation. Temporary staging data and retained project records serve different purposes.
-
Government Project Delivery Function · Current online framework; page published June 10, 2025
Framework introduction; role families and roles; guidance on job titles.
The source is the UK government framework introduction and role index. The guide's capability map is a general model for major projects.
-
Association for Project Management · Competence Framework, 3rd edition; example role profiles
How to use the APM Competence Framework: Role profiles; introduction to PMO Officers and Specialists profile.
The cited material introduces example role profiles within APM's wider competence framework.
-
AACE International · Living online framework; public publisher overview
Framework introduction; What Is the Total Cost Management Framework?; How the Total Cost Management Framework Integrates with Cost Engineering Practices.
This source is the publisher's overview; the complete framework is available separately.
-
Association for Project Management · Public topic overview; no numbered edition stated
Core elements; Who is responsible for project controls.
This source is APM's public topic overview, separate from its longer project-controls publication.
-
Association for Project Management · Public topic overview drawing on APM Body of Knowledge, 8th edition
Definition; types of PMO; benefits and services.
The source is APM's public overview. Embedded, central and combined PMOs are examples whose responsibilities vary by organisation.
-
Association for Project Management · Living public glossary; entries draw on several editions and publications
Risk manager; Risk owner; Sponsor; Project manager; Project management office entries.
The glossary draws terminology from several Body of Knowledge editions and other publications.
-
Association for Project Management · Public topic overview drawing on APM Body of Knowledge, 8th edition
Definition; Teams and leaders; Four key skills for successful project leadership.
The source is APM's public topic overview, separate from the complete Body of Knowledge and teamwork guide.
-
Government Project Delivery Function · The Teal Book, version 3.0; chapter updated July 1, 2026
Sections 32.4-32.5; 32.6.1.1; 32.6.1.3; 32.6.2.3-32.6.2.4.
Chapter 32 concerns UK government project delivery, including its formal accountability model.
-
Association for Project Management · Current public career guidance; no numbered edition stated
Career-change quick tips; Eight steps, especially existing experience, skills gaps, networking and learning routes.
This guidance concerns project-management careers. Entry routes for engineering, design, trades and other specialist roles vary by employer and location.
-
High Speed Two (HS2) Limited · Current public careers guidance; main page updated October 15, 2026
How to apply; linked Careers with our supply chain and Early careers pages.
HS2 illustrates UK infrastructure career routes. Current openings and eligibility depend on the employer.
-
Jieyu Zheng and Markus Meister, Caltech · Neuron 113(2), 192-204, 2025; published online December 17, 2024
Zheng and Meister. Neuron. DOI: 10.1016/j.neuron.2024.11.008.
Introduction; Table 1; The information capacity of the nervous system; Appendices A-B.
These task-based estimates depend on encoding and assumptions. Their extension to the whole brain is disputed, and they do not set a reading-time or chart-count limit for reports.
-
Government Digital Service and Central Digital and Data Office · Public guidance, updated 3 September 2026
Discover your requirements and capabilities; Choosing to build technology; Choosing to buy technology; Define your commercial approach.
This guidance concerns UK government technology purchasing; its purchasing rules apply within that setting.
-
Government Digital Service, Technology community · Service Manual guidance, updated 15 October 2024
What to consider when choosing technology; Understand the landscape; Start with prototypes; Allow for evolution.
The guidance concerns UK government digital services, rather than a construction PMIS specification.
-
Cabinet Office · Public HTML edition updated 20 June 2023
Chapter 6, Testing and piloting solutions; Chapter 9, Cost and quality and Robust evaluation processes; Chapter 12, Exit planning, Transition and Data exchange.
The cited sections are from the 2023 UK government Playbook. Its statutory rules, thresholds and mandatory wording belong to that policy context.
-
Construction Industry Institute · Public overview of the PDRI family; no numbered overview edition stated
Opening explanation of scope definition and front-end planning; repeated assessments before authorization; guidance on selecting a PDRI for the project type.
The source is CII's public PDRI overview. Detailed score sheets, manuals and validation studies are separate publications.
-
National Infrastructure and Service Transformation Authority · Public HTML guidance updated 20 August 2026
Introduction, assurance framework, tailoring and purpose; Assessment of the Proposed Solution, general business-case question and management questions 6.14, 6.19 and 6.20.
Gate 3 numbering and approval arrangements describe the UK government assurance process.
-
HM Treasury · 2026 edition; public HTML updated 28 October 2026
Overview of appraisal and Five Case Model; Chapter 6, Sunk costs and Sensitivity analysis and switching values.
This guidance is written for UK public-sector proposals, including its social-value framework and discount rates.
-
International Organization for Standardization (ISO) · Edition 1, December 2018; confirmed in 2024; revision in development
Public abstract, publication status and linked revision notice.
The source is the public abstract for ISO 19650-1:2018. It introduces information-management concepts without prescribing a universal status-code scheme or software configuration.
-
UK National Protective Security Authority (NPSA) · Public advisory overview; indexed version reviewed October 2026
Public overview of BS EN ISO 19650-5 and Securing Underground Asset Data.
The cited example concerns underground-asset information; it illustrates an access principle rather than a universal legal rule.
-
Amy Edmondson · Administrative Science Quarterly · 1999 · Administrative Science Quarterly 44(2), pages 350-383 · DOI 10.2307/2666999
Author paper: abstract and team-learning definition, pages 350-351; study limitations, pages 378-379. Public copy also available through MIT.
-
UK Health and Safety Executive · Public human-factors guidance · page dated 20 November 2024
Learning organisations overview; active and passive learning; barriers to organisational learning.
This is general guidance from the UK's safety regulator on organisational learning.
-
UK BIM Framework (guidance now hosted by the IMI Framework) · Edition 2, February 2021
Sections 1.3 to 1.6 and 2: organizational, asset, project and exchange information requirements; level of information need.
This 2021 UK implementation guidance explains information-requirements concepts; it is separate from the full ISO standards.
-
UK BIM Framework (guidance now hosted by the IMI Framework) · Edition 1, September 2020
Sections 1 and 2, Figure 2; sections 5 and 6: workflow, revision control and status metadata.
The publication's specific status codes come from the UK National Annex. Other projects may use different agreed codes.
-
buildingSMART International · Public technical introduction; ISO 16739-1:2024 identified by the publisher
What is IFC? and How is IFC used?
This technical introduction explains the IFC data model. An actual exchange also depends on export settings and the applications involved.
-
buildingSMART International · IDS 1.0; final standard announced 4 June 2024
Official repository README and user manual; publisher announcement of IDS 1.0 final status.
IDS checks information requirements. Engineering and geometric review remain separate checks.
-
buildingSMART International · Public technical introduction; BCF XML and API implementations
What is BCF? and How is BCF used?
BCF supports issue exchange; the format does not itself resolve a coordination issue.
-
International Organization for Standardization (ISO) · Edition 1, July 2020; confirmed in 2024; replacement drafts in development
Public abstract, publication status and replacement notices.
The source is the public abstract for ISO 19650-3:2020, which concerns information management during asset operation.
-
AusIMM · Project Evaluation 2009 · Publication P200903003
Publisher abstract, particularly the paragraph identifying IPA's Front-End Loading Index and Team Development Index; contributor and publication metadata.
Publisher abstract for a 2009 minerals and metals project paper.
-
Association for Project Management · Public guidance based on APM’s 2017 project-handover research
Process; Data and knowledge transfer; People
-
HS2 Learning Legacy · Micro-report, 12 April 2022
Ian McMillan. Planning for a smooth and finite transition. HS2 Learning Legacy, 12 April 2022.
Background and industry context; Transition strategy; Recommendations
-
UK National Infrastructure and Service Transformation Authority · Updated 20 August 2026
Readiness for Service; Purpose of the Gate 4 Review; Core Questions 2.4 Economic and 5.1-5.8 Management
UK government assurance guidance. The workbook sets out different review timing for property/construction and IT projects.