The Major Project Podcast · Episode 001
Your PDU learning record
When Every Minute Counts: The World of Turnarounds
With Grant Stead
Use the episode details below to report your learning. Check your dates, add notes, adjust the amounts for what you completed, then save a copy for your records.
Episode details
- Activity type
- Education · Online or Digital Media
- Provider
- The Major Project Podcast
- Title
- Episode 001: When Every Minute Counts: The World of Turnarounds with Grant Stead
- Description
- Plan the detail behind a fast turnaround, align committed crews with the work, and turn field information into decisions leaders can act on.
- Recording length
- 1 hr 30 min 42 sec
- Recordings
- Watch the main episode · All listening options
What you can learn
- Explain how discovery, inspection, repair and restart shape a turnaround plan.
- Compare a time-phased work estimate with the resources contractors have actually committed.
- Trace reported progress back to field records and present practical interventions to leadership.
Learning covered in this episode
Explore key moments from the learning conversation. Each time link opens the video at that point.
| In the video | Skill area | Learning covered |
|---|---|---|
| 2:30 to 6:00 | Ways of Working | The turnaround lifecycle: maintenance, capital tie-ins, rapid mobilization, equipment restoration and the importance of a reliable first restart. |
| 6:00 to 7:10 | Business Acumen | How refinery downtime affects lost production, storage and contractual supply commitments. |
| 7:20 to 12:00 | Power Skills | Creating a calm working culture through clear direction, predictable cadence and awareness of how leaders influence behavior under pressure. |
| 12:05 to 16:40 | Ways of Working | Structuring owner and contractor responsibilities, shift handovers, productivity reviews and daily discovery meetings. |
| 16:50 to 20:15 | Ways of Working | Using inspection history, equipment-specific contingency and rapid change control to respond to discoveries during an outage. |
| 20:30 to 23:20 | Ways of Working | Managing startup prerequisites, operational changes, isolation, inspection, repair and restoration sequences. |
| 25:45 to 32:20 | Ways of Working | Testing labor ramp-up assumptions, tracking named resource commitments before mobilization and accounting for competing demands on the workforce. |
| 33:10 to 40:10 | Ways of Working | Allowing for unforeseen findings and overlaying contractor resource plans against detailed, time-phased estimates to expose shortages and excess staffing. |
| 42:50 to 47:00 | Ways of Working | Matching schedule detail to how field teams execute and record work, including weld records, quality steps and rules of credit. |
| 47:25 to 55:30 | Power Skills | Building leadership confidence, coaching teams to bring options and explaining the decisions behind an adverse performance report. |
| 55:30 to 61:10 | Ways of Working | Maintaining report timeliness, data ownership, repeatable ingestion, review of changes and a named person who confirms submitted information. |
| 63:10 to 68:40 | Ways of Working | Connecting drawings, material takeoffs, fabrication status and revisions to the work that must be prepared and executed. |
| 69:30 to 71:05 | Ways of Working | Checking extracted drawing title blocks and material quantities against the actual sheets, and identifying duplicate sheets that conceal missing work. |
| 72:12 to 73:29 | Ways of Working | Structuring and validating drawing and material-takeoff information before handing it to contractors so work can roll up correctly. |
| 74:11 to 75:10 | Ways of Working | Checking document identity against the actual drawing title block rather than trusting file names, folders or a separate list. |
The Major Project Podcast · PDU learning record
https://www.themajorprojectpodcast.com/pdus/grant-stead
Report through https://ccrs.pmi.org/ under Education → Online or Digital Media. Retain this record for at least 18 months after your certification cycle ends.