The Major Project Podcast · Episode 026
Your PDU learning record
The Report Is Not the Truth
With Ahmed Abdelfattah
Use the episode details below to report your learning. Check your dates, add notes, adjust the amounts for what you completed, then save a copy for your records.
Episode details
- Activity type
- Education · Online or Digital Media
- Provider
- The Major Project Podcast
- Title
- Episode 026: The Report Is Not the Truth with Ahmed Abdelfattah
- Description
- Make reports useful to decision-makers, connect schedules to uncertainty and site conditions, and build trust in the people behind the numbers.
- Recording length
- 1 hr 10 min 26 sec
- Recordings
- Watch the main episode · All listening options
What you can learn
- Distinguish contractual reporting records from reports designed to support a particular decision.
- Use scenarios, risk analysis and field input to challenge a deterministic schedule.
- Present information in context and build credibility with the audience who must act on it.
Learning covered in this episode
Explore key moments from the learning conversation. Each time link opens the video at that point.
| In the video | Skill area | Learning covered |
|---|---|---|
| 4:00 to 5:40 | Ways of Working | Keeping project controls focused on delivery outcomes instead of optimizing its own internal process. |
| 8:00 to 13:45 | Ways of Working | Organizing cross-functional reporting inputs and understanding why expensive integrated systems can still leave a gap in usable information. |
| 14:05 to 16:50 | Power Skills | Communicating scenarios and their consequences to executives who need a decision rather than a technical explanation of every number. |
| 17:10 to 20:00 | Ways of Working | Checking reports against site conditions and recognizing the different record and audit requirements that influence reporting processes. |
| 22:40 to 24:55 | Power Skills | Aligning competing disciplines, clarifying who directs changes and framing the risks and decisions that leaders need to hear. |
| 25:00 to 34:20 | Ways of Working | Introducing risk analysis early, questioning false precision in long-range schedules and using simulated scenarios to inform a decision. |
| 35:10 to 37:00 | Ways of Working | Separating systematic contractual records from dynamic reports prepared for a specific decision. |
| 37:00 to 40:00 | Power Skills | Understanding the audience, their background and constraints, then explaining information in language that supports their decision. |
| 40:00 to 43:00 | Ways of Working | Designing a report around its purpose, visual hierarchy and the central issue or decision. |
| 43:00 to 47:40 | Power Skills | Building executive trust through the credibility of the presenter, confidence in the underlying data and care in how the report is prepared. |
| 48:00 to 53:30 | Ways of Working | Tracing approval and document-routing delays that separate site problems from timely engineering decisions. |
| 54:00 to 56:00 | Ways of Working | Maintaining comparable period records while distinguishing historical performance from forward-looking forecasts and scenarios. |
| 57:20 to 60:30 | Ways of Working | Building realistic near-term plans from site-team logic and constraints rather than detached office assumptions. |
| 62:15 to 65:10 | Power Skills | Presenting a performance trend and recovery outlook so stakeholders can discuss improvement without changing the underlying facts. |
The Major Project Podcast · PDU learning record
https://www.themajorprojectpodcast.com/pdus/ahmed-abdelfattah
Report through https://ccrs.pmi.org/ under Education → Online or Digital Media. Retain this record for at least 18 months after your certification cycle ends.